Forty services, one support date

Microsoft support for .NET 8 ended on 10 November 2026, and a SaaS company has 40 services and their container base images on it. Moving them all at once is not realistic.

Challenge

The date applies to the whole estate at once, and the migration does not. .NET 9 ended on the same day, so there is no interim version to step onto. Every service has to reach .NET 10 LTS, and each one brings its own breaking API changes, NuGet dependencies and test coverage.

The container images are a separate problem that the migration schedule does not solve. Microsoft stopped supporting every .NET 8 tag on mcr.microsoft.com on 10 November 2026. The tags still pull, but they are no longer rebuilt, so the .NET layer and the Debian or Ubuntu layer underneath it stop receiving fixes. Scanners will report a growing list of findings on every image built from them, including on services that are already scheduled to move.

Environment

Forty ASP.NET Core 8 services in containers, built from the mcr.microsoft.com sdk and aspnet 8.0 images, with a shared set of internal NuGet packages and an Entity Framework Core data layer in most of them.

The services have different exposure. A few face the internet, some handle customer data and some are internal batch jobs. They also change at different rates, so a team that ships weekly and a team that ships quarterly will not reach .NET 10 together.

Options

Migrate everything to .NET 10 before the next scanner run. Right in principle, but forty services do not move in one change window, and the images fail scans from day one.

Swap base images only. Move to a maintained image of another vendor or rebuild on a different OS layer. Fixes the layer under the runtime and leaves the .NET 8 runtime itself unpatched.

Patch .NET 8 while services move in order of exposure. Both the runtime and the images stay covered, so the order of migration can follow risk instead of the calendar.

Stay on the Microsoft tags. The images keep working and the findings keep growing.

Approach

OSSeva Patch keeps .NET 8 covered: patched runtimes and ASP.NET Core, delivered as Docker images (Alpine and Debian variants, SDK for the build stage and ASP.NET Core for deployment) and as packages. The images are drop-in replacements. Each service updates its FROM line, rebuilds and redeploys, so covering the whole estate is a change to the base image reference rather than forty migrations. Critical CVEs (CVSS 9.0 or higher) are fixed within 48 hours and High within 7 days, with signed artifacts, an SBOM and a VEX statement per CVE.

OSSeva Assure adds the .NET 10 LTS migration assessment: breaking API changes between the version a service runs and .NET 10, NuGet dependency compatibility, ASP.NET Core configuration changes, the Entity Framework Core path and authentication and authorization middleware updates. It also includes NuGet dependency scanning and a container base image hardening review. That assessment is the input to the order: internet-facing services and the ones that carry the most findings first, quiet internal jobs last.

OSSeva Operate can execute the .NET version migrations, with 24/7 CLR and application monitoring, GC pressure alerting and a named .NET engineer on the account. Each service stops needing a .NET 8 build when it reaches .NET 10, which Microsoft supports to 14 November 2028.

What this delivers

Every .NET 8 runtime and image covered from the first day, a documented order for the move to .NET 10, and a migration that finishes service by service instead of failing a deadline. OSSeva .NET support is priced per application runtime environment. Book a discovery call for a quote.

Go deeper

Questions

Frequently asked questions

Book a 15-minute call

Do the .NET 8 images stop working after 10 November 2026?

No. The tags on mcr.microsoft.com still pull and run, but Microsoft no longer rebuilds them. New .NET fixes and OS-level fixes do not reach them.

Can we skip .NET 9 on the way to .NET 10?

Yes. .NET 9 ended on the same day as .NET 8, so stopping on it gains no support time. .NET 10 is supported to 14 November 2028.

Does a patched .NET 8 image change how services are built?

Only the base image reference. The images are drop-in replacements, so a service updates its FROM line, rebuilds and redeploys.

What does the .NET 10 assessment look at?

Breaking API changes, NuGet compatibility, ASP.NET Core configuration, the Entity Framework Core path and authentication middleware. It is the basis for the migration order.

See every EOL & CVE-patching use case